DSpace
 

EPrints@IIT Delhi >
Faculty Research Publicatons  >
Mathematics >

Please use this identifier to cite or link to this item: http://eprint.iitd.ac.in/handle/2074/698

Full metadata record

DC FieldValueLanguage
dc.contributor.authorChatterjeea, N-
dc.contributor.authorCampbell, J A-
dc.date.accessioned2005-08-04T11:15:47Z-
dc.date.available2005-08-04T11:15:47Z-
dc.date.issued1999-
dc.identifier.citationKnowledge-Based Systems, 12(4), 171–182en
dc.identifier.urihttp://eprint.iitd.ac.in/dspace/handle/2074/698-
dc.description.abstractMost techniques for knowledge-based plan adaptation are search-intensive as they rely on a general search through plan libraries to find suitable items for development or adaptation. This degrades their usefulness for real-time computations. The paper states and illustrates a plan-construction technique, “plan interpolation”, whose purpose is to keep the amount of searching small. It selects two past plans, and then generates a new plan by a method that is similar to “interpolation” in the sense of numerical analysis. The approach and its details are illustrated by reference to examples drawn from the domain of ground operations control in an airport.en
dc.format.extent608471 bytes-
dc.format.mimetypeapplication/pdf-
dc.language.isoenen
dc.subjectPlan adaptationen
dc.subjectInterpolationen
dc.subjectTime-criticalityen
dc.titleInterpolation of plans for time-critical adaptationen
dc.typeArticleen
Appears in Collections:Mathematics

Files in This Item:

File Description SizeFormat
chatterjeeint1999.pdf594.21 kBAdobe PDFView/Open
View Statistics

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback